搜索
English
  • English

Installation of ANLAN's products

Author:ANLAN Time:2017-10-05 15:09:59

About installation conditions:

● All ANLAN’s products are adequately designed to be transported and installed.

● Most of them are installed modularized in the factory, just simple lifting and assemble work needed on construction site. 

● In most cases, only conventional tools such as cranes need to be used for construction. 

About installation time:

● Small projects can be installed in about one week, while large-scale projects will take about two weeks to one month or so. 

● If the owners request to speed up the construction progress, we can increase the manpower to speed up the installation process. 


In the process of transportation and installation, ANLAN will provide perfect service from the perspective of customers.

For more information, just contact us: +86 20 28187297,  info@anlan.group.


文章推荐

    P.O.Box 511458, Jingang Avenue, Nansha District, Guangzhou City, China. 

     +86 20 28187297 

     +86 15218898617  (     )

   info@anlan.group

 

 

Guangzhou ANLAN Waterfront Engineering & Technology Co.,ltd

All rights reserved | Private Policy | Sitemap | Website

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了